Reports TRANSITION Project Progress Report

Publication Date:

4th October 2019

Downloads:

READ HERE

TRANSITION Project Progress Report

This document focuses on progress of TRANSITION between September 2018 and September 2019.
During this reporting period, the Project has focused on:

  • Defining the requirements for the NMF.
  • Defining the requirements for the WSC.
  • Developing the Flexibility Services to trial.
  • Define the basic Market Rules which will be utilised
    during the Trial Phase.
  • Developing Site Selection methodology.
  • Selecting a vendor for the Substation monitoring
    equipment.
  • Interfacing extensively with the T.E.F. collaboration
    and Project LEO.